20 for 2020: week 32

Week of 3 August

My 20 for 2020 list.

20200803 Hinsby Beach 10
Why is that photographer coming back from the beach with a giant lens? Ohhhh! There’s a giant pink full moon out there! Why didn’t I bring my camera out?

We got the reading material for our final unit of the uni course (thing 8) on Monday. I spent a couple of hours organising the material and making a study plan so I know what I need to do over the next 11 weeks. I’m trying to be more organised with this unit so that I can get more out of it than I did the last one.

 

I have three weeks to work through the first three modules (there are six) before our face to face workshop. I thought that working through a topic in each module a day (most of them have five topics) would be a good pace. That would mean I’d need to set aside roughly an hour a day to work on it.

That sounded fine in theory, but finding that hour wasn’t as easy as I thought. I found myself drifting through my days without a plan and finishing the day without having done any of the work, so by Saturday morning, when I wanted to have completed the first module, I’d done exactly no readings.

It’s amazing how easy it is to not do the work when there is no real consequence of not doing it. I found with the assignment in the last unit, I could focus on that all day because I had to do it, there was a hard deadline, and there were major consequences of not doing it (i.e. failing the unit). Whereas with the course reading material, it’s all self-directed and you are responsible for doing it: there’s no one to check up on you, nothing to hand in and no mark at the end.

Clearly, if I want to get something out of this unit, this isn’t the way to do it, so I made it a priority on the weekend to complete the first module and to schedule regular time each day to work on the material. This fits in nicely with the work I am doing to better organise my workload at work and to try and prevent my role of being that annoying person in the branch who manages all the coordination requests (I mean, being my branch’s coordination superhero) leaking over into the rest of my day and affecting my ability to focus on the projects I’m supposed to be doing.

That’s a whole other story and perhaps I’ll write a post about it one day, once I get it worked out.

The other thing I need to do for uni is to decide on a workplace project and get started on planning that so I can hand in my draft project plan next week. This project will decide my final mark so there is a real consequence of not doing that. It’s been something I’ve been thinking about since the start of the course back in September 2019 but now it’s time to take my thoughts and put them into something that I’m actually doing to do. I have ten weeks to plan it, do it and report on it. No pressure, then.

20200803 Cherry blossom 1
Spring started to spring . . .

I didn’t hear back from the sewing machine people (thing 2), so I’m not sure where that’s at.

I had a conversation with one of my workmates this week, which turned into a conversation about our art (she’s a proper artist who has actually had shows). I was telling her about my Photoshop work (thing 7) and a vague idea for a project I want to do but how I feel a bit overwhelmed about getting stuck into it because it’s all so new and there is so much to learn. She said the same thing to me as I’ve heard and read so many times that it should be ingrained into my mind and something that I just do. That is, it doesn’t matter what you do, just do something. Make a commitment to do just one thing every day. She said for her it might be something as small as making a decision on the thickness of a hem. And she said that sometimes just doing one thing will lead you to do something else and something else and, before you know it, you might have completed a piece. Which is great. Or it might not, which is fine too because you’ll still be one step further than you were before you did it.

That’s the point of my 15 minutes a day creative habit. Just like my uni work, I need to schedule this and then actually do it. I know I can’t commit to doing huge chunks of the Photoshop course during the next ten weeks. I’ve already agreed with myself that I can’t possibly take on two huge study projects at the same time and that the Photoshop work is going to take a back seat for now. But 15 minutes a day, I can do that if for no other reason to reinforce to myself that I am creative and that I make art. Even if it’s bad art. To quote photographer David duChemin, everyone starts ugly. But without the ugly start, you’re never going to make anything beautiful.

I went back over my monthly review and picked up on the things I didn’t quite get through when I did it last week. In particular, I wanted to set some goals for August:

  • Complete all of the readings for Unit 4.
  • Decide on a workplace project and submit the proposal.
  • Commit to 15 minutes a day to creating something.
  • Finish two chapters of a book I’m working through.
20200804 Davey & Murray St 503pm-1
. . . and winter hit back

I also decided to ask myself three questions at the end of each week:

What did I do well or what did I achieve this week?
I can’t think of anything.

I need to pay attention to small wins and accomplishments to remind myself of the good things I did. And knowing I’m going to be writing about it each week is going to inspire me to think of at least one thing I did well . . . it’s going to look like I’m pretty down on myself if I only write about what didn’t go well!

Actually, now I think of it, I did do something well. I overcame my fear of speaking in meetings and contributed to a national meeting of about 40 people, most of whom I’ve never had anything do with, on a subject I am not very familiar with.

What didn’t go so well?
I’m still struggling with going to bed on time and getting up with the alarm instead of lying about in bed for half an hour or more. My Fitbit sleep scores are mid-80s. I want this to improve.

What do I want to do better next week?
Start packing up at 10.15. Set a reminder for this.

Schedule time to create something every day and actually do it.

Summary for the week

  • Things completed this week: 0
  • Things completed to date: 11 (1, 3, 4, 5, 6, 10, 14, 15, 16, 18, 20)
  • Things I progressed: 2 (8, 22)
  • Things in progress I didn’t progress: 5 (2, 7, 11, 13, 17)
  • Things not started: 4 (9, 12, 19, 21)
  • Days I stuck to my 15 minutes creative habit: 3
  • Days I read a book: 7
  • Days I did yoga stretches: 0
  • Days I was in bed by 10.30: 6
Share this